Connecticut General Statutes § 25-238a
Farmington River optimum flow. Dam release and holdback requests.
Title 25 · Chapter 485 · General Statutes of Connecticut, revised to January 1, 2025
(a) The Commissioner of Energy and Environmental Protection, in consultation with the Metropolitan District Commission, shall make Colebrook River Lake Dam release and holdback requests to the United States Army Corps of Engineers, as needed, to achieve an optimum flow in the Farmington River for: (1) Fish and wildlife, (2) recreation, (3) the river's health, (4) flood risk reduction, (5) tourism, (6) hydropower, and (7) safety.
(b) Notwithstanding any provision of the general statutes or any special act, the Metropolitan District Commission shall release from the Goodwin Dam any amount of water released from the Colebrook Dam based on a request of the Commissioner of Energy and Environmental Protection in furtherance of the provisions of subsection (a) of this section.
(P.A. 24-13, S. 1.)
History: P.A. 24-13 effective May 14, 2024 (Revisor's note: In Subsec. (b), a reference to “Commissioner of Energy and Environmental” was changed editorially by the Revisors to “Commissioner of Energy and Environmental Protection” for accuracy).
cga.ct.gov
cga.ct.govThe text above is reproduced word for word from its official source. General information only — not legal advice.